08/9/23 Installed Custom Face Plates In Tureaud Hall For The Touch Screens In All 28 Rooms.
08/9/23 Installed Custom Face Plates In Tureaud Hall For The Touch Screens In All 28 Rooms.
09 Aug
09Aug
08/9/23
Installed Face Plates In Tureaud Hall For The Touch Screens In All 28 Rooms.
Used fluke networks to make sure any peripherals were not working because of a bad or faulty cables. All cables are verified and will be addressed in programming.